Sign In | Join Free | My udpf.com
udpf.com
Products
Search by Category
Home > Earth-moving Machinery >

1m3 Bucket Small Articulating Front End Loader For Construction Machinery

Categories 2 Ton Wheel Loader
Brand Name: MCLLROY
Model Number: MCL932 ZL932
Certification: CE,ISO9001
Place of Origin: China
MOQ: 1 Set
Price: $ 4000-6000 /Unit
Payment Terms: 30% T / T in advance and 70% balance before shipment Or 100% L/C at sight
Supply Ability: 100 sets / month
Delivery Time: 5-8 working days
Packaging Details: Nude ,3 Sets Fasten Packing in 1 40HQ
Moving type: Wheel Loader
Dimension(long * breadth * high): 5500*1620*2750mm
Condition: New
Dumping height: 3200mm
Machine weight: 3500KG
Engine power: 58kw
Type: Front Loader
After-sales service provided: Engineers available to service machinery overseas,Video technical support,Online support
Color: Customize
Attachments: Fork,Snow bucket,Kinds,trencher
Engine Model: YN490 Supercharged
speed/min: 2400
Gear Box: CVT
Alex: S-hub reductro
Frame: Articulated
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

1m3 Bucket Small Articulating Front End Loader For Construction Machinery

3500kg Weight Small Front End Wheel Loader, 1.0m³ Bucket Capacity Wheel Shovel Wheel Loader

1. Products Description

In general, for construction machinery, the four most important factors are: price, quality, operation, and after-sales.


The amount of shovel material and the stability of the loader depend on the cooperation of the loader frame.

The flexibility and light operation mainly depends on the hydraulic system of the loader.

The low failure rate depends on quality as well as the after-sales service.


MCLLROY wheel Loaders are widely used in the construction, municipal engineering, urban and rural gardens, lime, sand, cement factories, mines and other enterprises and institutions and departments. It is particularity applied to the narrow space for the loading operation of stone,sand and other construction materials.


2. Specification

ModelMCL932
ZL932
MCL936
ZL936
Rated Loadkg18002000
Dipper Bucket Capacitym³/m1.0/1.9m1.1/2.0m
Max.Dump Clearancemm32003500
Dump Reachmm13501650
Overall Size (L*W*H)mm5500*1620*27506025*2000*3000
Engine ModelYN490YN4100 Supercharged
Rated powerkw5865
speed/minrpm24002400
Gear BoxCVT280B Split Torque converter
AlexS-hub reductroM-hub reductro
Operating Weightkg33005300
ArticulatedArticulatedArticulated
Tyre Size20.5-161670-20
Joystick includedMechanicalMechanical
Airconincludedincluded
Hydraulic pilot(option)***Without
running hour meterrunning hour meterrunning hour meter
air brakeair brakeair brake

3. Details and Advantages

The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.

  • Engine:Strong driven force ,low fuel consumption ,high economic benefits.
  • Transmission:Split torque converter,not high temperature,easy to repair.
  • Axle: Heavy-duty axle ,planetary reduction ,solid and durable ,with the corresponding tires ,for the loader to provide.
  • Hydraulic system:Fully optimized layout of pipes Waterproof connectors.

4.Production lines:

A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection


Spray painting:

Normally, the spray painting process includes hanging the parts, spraying primer or first layer coating, baking finish, spraying second layer coating, baking finish, drying in three different temperature.

The workers in charge of hanging will check if the part has dust and oil, anything that will affect painting, which will be removed.

There are two worker at Station 1 to do the painting on one side of the part.

Another 2 workers at Station 2 will paint the other side, and the third worker will check if there is any spot missing and repaint.

Next is our baking room and No. 1 to No. 3 drying machines.

Pick up station workers use forklift to transfer the finished parts to the part's corresponding storage place, which is usually next to the production line.

Some factories only hire one person to take care of the spray painting to cut the cost. It is hard to control the painting quality like that.

Our technicians in the painting process are supposed to control the painting flow rate just right, without over painting, and the thickness of each surface should be balanced. In the pick up Station, there are special personnel for quality inspection of painted parts. Similarly, our factory adopts report mechanism. Subsequent assembly or factory inspection inspector find that the spray painting is unqualified and they will report it.




Similar Model:

Cat 903D/906M/907M/908M

XCMG LW156/LW160/LW180/LW186/LW200

Liugong 816C

SDLG LG916 LG918 L918


Cheap 1m3 Bucket Small Articulating Front End Loader For Construction Machinery for sale
Send your message to this supplier
 
*From:
*To: Chanchiyo Holdings Group
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0