| Sign In | Join Free | My udpf.com |
|
| Categories | Carton Box Stitching Machine |
|---|---|
| Brand Name: | ZHAOLI |
| Model Number: | DXJ |
| Certification: | CE |
| Place of Origin: | CHINA |
| MOQ: | 1 set |
| Price: | Negotiable |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union |
| Supply Ability: | 30 sets per month |
| Delivery Time: | 30 days after receive deposit |
| Packaging Details: | semi-automatic slotting corrugated carton box stitching machine : plastic film |
| product name: | semi-automatic slotting corrugated carton box stitching machine |
| function: | carton box stitching |
| automatic type: | semi-automatic |
| speed: | 400nails/min |
| model: | DXJ-2000 |
| feature: | change order one minutes |
| other name: | semi-automatic speeding corrugated carton box stitching machine |
Semi-automatic Slotting Corrugated Carton Box Stitching Machine
Machine features:
1 One minute quick order change.The whole machine adopt full
electrical control,easy to operate, no training.
2 Single, double, supplement stitching are available.
3 Stitching pitch is 20-160mm, automatic caculate stitching pitch;
servo motor from Taiwan to control stitching pitch.
4 Touch screen adopt Taiwan Eview brand, 5.7 inch high definition
colorful display touch screen.
5 The latter department automatic counter, can design as 1-99, easy
to binding.
6 Head and fork material main is exported alloy steel, made through
special heat treatment process.
7 The max unfolded single sheet width is 4m, min is 1m.
8 Stitching whatever the carton have cover or not, the first stitch
pitch is 20mm.
9 Adopt Germany timing belt to send the paperboard, can avoid the
price scissors. Adjust feeding paperboard timing belt electrically,
adjust head size electriclly to fasten change order speed.
10 Working table up and down automaticlly.
Technology:
| max working size (length+width)x2 | 2460mm |
| min working size (length+width)x2 | 606mm |
| max working size (width+height)x2 | 1515mm |
| min working size (width+height)x2 | 300mm |
| height of table | 900mm |
| speed | 400nails/min |
| power | 4kw |
| machine size | 2.8x2.6x1.7m |
| machine weight | 2000kg |
| stitching pitch | 30-100mm |
Package:
The normal package is plastic film(Size: L*W*H). If export to european countries,the wooden box will be fumigated.If container is too tigher,we will use pe film for packing or pack it according to customers special request.
pictures:

|