Sign In | Join Free | My udpf.com |
|
Categories | Polyurethane Foam Machine |
---|---|
Brand Name: | ZHMACH |
Model Number: | ZHF-2017 |
Certification: | CE |
Place of Origin: | Guangdong, China (Mainland) |
MOQ: | one set |
Price: | USD125000~ 145000/PET SET |
Payment Terms: | Western Union, L/C, T/T |
Supply Ability: | two sets per month |
Delivery Time: | 45days after receive downpayment |
Packaging Details: | foam machine Automatic continously foam making machine nude packing together with some paper and plastic film and foam sheet some small spare parts in wooden box one standard machine need 1*20GP 2*40HQ |
Condition: | New |
machine pump: | U.S VIKING PUMP/ JAPANESE |
After-sales Service Provided: | Engineers available to service machinery overseas |
RS pulling system: | R.S.pulling system with the plastic film |
Flow meter: | Glass flow meter |
Block cutter: | Blade & Saw tooth knife Type |
Feature: | high efficiency |
Voltage: | 3 PAHSE 380V |
control system: | German siemens plc and invertor |
Company Info. |
Dongguan Zehui machinery equipment co., ltd |
Verified Supplier |
View Contact Details |
Product List |
Horizontal Continous Polyurethane Memory foam Pillow making machine Big Capacity
Product Description
Foam Sponge Making Machine Line is the automatic horizontal continously foaming machine that make the furniture foam like sofa and mattress. The standard machine was together with 13 kinds of raw material.
For the process of foaming:
Loading all the raw materials inside the material tank with the loading system--control the temperature of the raw material inside the tank with the chiller--check the flow of all the raw materials before foaming--make some small sample test before foaming (make sure the flow and everthing is correct)--Put the karft paper and the plastic film-- foaming process
Main technique parameters and equipments
(1) The whole machine parts specifications:
1, Foaming controlling Platform (standard) L3m×W2.52m×H0.7m
2, Oven declining board (standard) L6.8m×W0.98m~2.3m
3, Oven side links (standard) L18m×W2.3m×H1.2m
4, Oven machine frame (standard) L18m ×W4m×H3m
5, Oven inner conveyer line (standard) L18m×W2.3m×H0.83m
6, Foam block cutter machine (standard) W2.3m×H1.30m(knife belt
with cross type )
7, Side film lift system one set
Main technique specification:
Max.Output Capacity | 200~350kg/min(Continuous Type) |
Mixer Total Power | 37kw |
Max.Mixing Speed | 2500~6000r/min |
Foaming Type | Trough & Sprayer |
Standard Material Q.T.Y. | 13 Groups. |
Foaming Size | W2300mm*H1300mm(Width Adjustable) |
Control System | PLC Digital Touch Screen |
PPG Tank | 5Ton*1Set. |
POP Tank | 5Ton*1Set. |
TDI Tank | 5Ton*1Set. |
MC Tank | 2Ton*1Set. |
Caco3 Tanks | 5Ton*1Set |
T-9/Amine/Color 1ABCD/ Silicone /Water Tanks | 180L*8Sets |
Side Wall Size | L16m*H1200mm |
Fall plate | L8.5m*W0.98~2.4m(Adjustable) |
Foaming Platform | L2000mm*W3000mm*H700mm |
Conveyor Line | L16.9m |
Side/Bottom Paper Feed & Rewind System | 2Sets. |
Walkway | W500mm*L15m |
Air Valves | U.S. Standard |
Chiller(Both Cooling & Heating System) | 1Set*1.5HP |
R.S.Pulling System | 1Set. |
Foaming Density Range | 8~150kg/Cubicmeter. |
Match With Block Cutter | 1Set. |
Total Motor Power | Approx 125kw. |
Machine N.W. | Approx 30 Ton |
Floor Space Required | L45m*W5m*H4.5m |
Our Services
We will help to design the layout of the machine that put in your
factory.
We will send 2-4 experience engineers to install and testing the
machines.
We will teach your engineer how to operate the machine and how to
maintain the machines.
We will give you the machine operation manual and the best
formulation for target products that you are going to make.
We will help to buy the best raw material for making the foam if
you needed.
FAQ:
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer
help to install the machine you must send someone to help about 30
days installation will finished. After that one electrician and one
foaming engineer will come to connecting the cable and run the
machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD40 one day for one engineer and also need to
pay for the visa fee turn-round ticket fee and food hotel.
Q:During the foaming if we have some problems abt the foam and the
machine how can we do ?
A: You can just call our after sale manager explain for the
situation or send some picture we will help to handle within
24hours.
The main part of the machine
![]() |